M-Spa OASIS Owner's Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 58
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
STARTING YOUR SPA
MARQUIS SPAS • RELAXING YOUR WORLD 9
START-UP PROCEDURE
Your spa is equipped with solid state preprogrammed Comfort Controls specific to your spa
model. Please see the CONTROLS section listed under your particular spa series model.
To start your spa, you will need a spa chemical test kit and an underwater thermometer.
It is important to follow each of these steps when starting your spa.
Leisure and Recreational Series Models Start-up:
1. Place spa on a hard, flat, level surface. Make sure the
power supply is off.
2. Make sure that the suction fittings in the footwell are
in place and undamaged.
3. Open the equipment door. Screw the pump plug
(supplied in packet) into the face of the pump. Close
the drain valve and screw the drain valve cap on
tightly. Tighten all disconnects and open all shut-off
valves. On models equipped with AWP external drain,
close valve by turning outer ring clockwise. Be sure
center plug is in place and tighten.
4. Fill the spa with water to two-thirds of the way up the
Vortex skimmer opening(s).
5. Turn the power on and wait five seconds.
6. At this time the spa should have water flowing from the
jets. If the pump has not primed and water is not
flowing from the jets after two minutes TURN OFF
POWER TO THE SPA and vent air from the pumps
by slightly opening the pump union. (See TROUBLE
SHOOTING section, Water Flow.)
7. Your spa water temperature is preset at 100° F. Use the TEMP SET pad on the
bather’s control panel to set the water temperature to the desired level.
8. SHOCK SANITIZE the water and test the water chemistry following the instruc-
tions in your chemical test kit.
9. Place the cover on the spa. It will take 12 to 24 hours for the water to heat to set
temperature.
10. Check the water temperature and adjust the setting if necessary. Normal use
is between 98° and 102° F.
Coastal and Ultimate Series Models Start-up:
Follow steps one through three of Leisure and Recreational Series Models Start-up.
4. Check to make sure the freeze line is properly connected.
Follow steps five through ten of Leisure and Recreational Series Models Start-up.
<
<
Pump Union
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 57 58

Comments to this Manuals

No comments